K.D. Stahl Construction Group Inc - Saint Therese Parish Restoration Construction Project by Sean Stahl

We've been awarded the Restoration of the Saint Therese Parish Cathedral and we have just began the grounds work restoration. Next phase we will be restoring the exteriors of the church to bring it back to its original fashion. 

Stay tuned as we will be updating this blog as the project moves forward. 

Location:

6016 Camino Rico
San Diego, Ca 92120

K.D. Stahl Construction Group Inc. - Saint Therese Parish Restoration Construction Project

Scope of Work:


Scope A. Renovate existing bell tower built in 1957 by removing the existing exterior plaster skin and ornamentation. Repair damaged framing and waterproof the structure with a self-sealing type waterproof membrane prior to applying the new lath and plaster system . All ornamentation will be replicated in foam. Tile dome will be rehabilitated in place.

The existing church tiled roof will be removed so the substrate can be repaired and receive a new self-sealing waterproof membrane prior to reinstalling the existing roof tiles. The interior TPO roofs inside the tower will be replaced as well. All existing gutters and downspouts will be replicated and replaced to match existing.

Scope B. The existing arcades between the church and the office have sustained flood damage thru the years, to remedy this the existing storm drain system will be rebuilt and adjacent grades adjusted to keep storm water from entering the arcade . The existing Spanish tile flooring will be salvaged. Columns will be stripped and repaired where water damage has occurred. The existing concrete substrate will be removed to allow for the new storm drains and replaced with Paver stones. The salvaged Spanish tiles will be applied as decorative base to the existing columns in the arcade.

K.D. Stahl Construction Group Inc. - Saint Therese Parish Restoration Construction Project
K.D. Stahl Construction Group Inc. - Saint Therese Parish Restoration Construction Project

K.D. Stahl Construction Group Inc - Bedrosian Tile & Stone Project Update by Sean Stahl

We have poured our foundational slab at the future Show Room for Bedrosian Tile & Stone on Miramar Road. All the sewer and underground MEP is completed. Next phase we will be pouring and standing walls. 

K.D. Stahl Construction Group Inc. - Bedrosian Tile & Stone Ground up New Construction

Bedrosian Tile & Stone
Tenant

Gensler
Architect

Dan Dickey
Project Manager

Chris Cherry
Superintendent

Scope of Work:

The new construction project will entail a 30,000 Sq.Ft. tilt-up building, with 6,500 Sq. Ft. of showroom, offices, and site work.

K.D. Stahl Construction Group Inc. - Bedrosian Tile & Stone Ground up New Construction
K.D. Stahl Construction Group Inc. - Bedrosian Tile & Stone Ground up New Construction

K.D. Stahl Construction Group Inc - Ionis Fitness Center Project Update by Sean Stahl

The Ionis Fitness Center Built for Ionis Pharmaceutical is well on its way. The concrete block walls are up and the slab is poured. Next Phase we will be erecting the structural roof steel.

Stay tuned as we will be updating this blog as the project moves forward. 

Location:

2855 Gazelle Court
Carlsbad, CA 92010

 
K.D. Stahl Construction Group Inc. - Ionis Fitness Center Ground up Construction

Ionis Pharmaceuticals
Tenant

DGA
Architect

BWE
Structural / Civil Engineer

MPE Engineers
Electrical Engineer

DEC Engineers
Mechanical / Plumbing Engineer

NERI Landscape Architecture 
Landscape Architect

Scope of Work:

This project consists of the partial demolition of an existing paved parking lot and associated site improvements and the construction of a new one story 5,475 s.f. employee fitness building, outdoor sports court, recreational green space, and associated site improvements.

K.D. Stahl Construction Group Inc. - Ionis Fitness Center Ground up Construction
K.D. Stahl Construction Group Inc. - Ionis Fitness Center Ground up Construction
K.D. Stahl Construction Group Inc. - Ionis Fitness Center Ground up Construction
K.D. Stahl Construction Group Inc. - Ionis Fitness Center Ground up Construction

Pre Slab Pour

K.D. Stahl Construction Group Inc - Ionis Fitness Center Project Update by Sean Stahl

The Ionis Fitness Center Built for Ionis Pharmaceutical is well on its way. The concrete block walls are up and the slab is scheduled to pour this week.

Stay tuned as we will be updating this blog as the project moves forward. 

Location:

2855 Gazelle Court
Carlsbad, CA 92010

 

Ionis Pharmaceuticals
Tenant

DGA
Architect

BWE
Structural / Civil Engineer

MPE Engineers
Electrical Engineer

DEC Engineers
Mechanical / Plumbing Engineer

NERI Landscape Architecture 
Landscape Architect

Scope of Work:

This project consists of the partial demolition of an existing paved parking lot and associated site improvements and the construction of a new one story 5,475 s.f. employee fitness building, outdoor sports court, recreational green space, and associated site improvements.

K.D. Stahl Construction Progress Update: cCare Nordahl Medical Centre Tenant Improvement by Sean Stahl

With the tenant improvement complete, we have turned over the building to our client and they are now seeing patients. 

Location:

838 Nordahl Road, Suite 300
San Marcos, Ca 92069

Team:

Client
Nordahl Medical Centre Inc. 

Space Planner
DesignCorp

HVAC Design
Harrington Mechanical Design Inc.

Electrical Design
Nutter Electrical Design Inc.

Project Manager
Bob Turner | bobt@kdstahl.com

Superintendent
Bob Broadburst | robertb@kdstahl.com

Scope of work:

14,000 sf Cancer Care Medical Facility, featuring, dr. offices, exam rooms, infusion bays, compounding pharmacy and a PET/CT scanner.

 

April 19th, 2017

There is a lot happening at the cCare Nordahl Medical Centre. Framing is complete, Drywall is hung and being taped and hot coated while some sections are in the finished coat phase. We currently have Greater San Diego Air Conditioning  on site installing all the HVAC systems, some of which is the AAON system for the future pharmacy. 

 

We have just begun the cCare tenant Improvement at Nordahl Medical Centre. Framing is underway, here are a few photos of the detailed framing going in right now.   

 

blog update: 03/09/17


Update 01/27/17

nordahlmedicalcentre
 
 
 
 
 
 
 

K.D. Stahl Construction Project Update: Hornblend Office Space Complete by Sean Stahl

The Hornblend Offices - construction is complete. This construction project consisted of a 6,000 sq.ft. wood framed building with a covered parking structure and second story office space. The project is located just a few blocks from the beach in the heart of Pacific Beach, Ca. and is the new home of Fortune Builders

Location:
967 Hornblend St.
San Diego, CA 92109

K.D.Stahl Construction Group Inc. - Pacific Beach Hornblend Office Space Ground up Construction

Design
R Balentine Consulting

Structural Engineering
Turley Engineering

Electrical Engineering
Randall Lamb

Mechanical Engineering
Randall Lamb


 

Scope of Work

Completion of a full remodel to the existing one story commercial structure in adding a parking structure as well a second story addition of office space and balcony. Included in the second story build out, we built a stairwell and light wells to second story. 

K.D.Stahl Construction Group Inc. - Pacific Beach Hornblend Office Space Ground up Construction
K.D.Stahl Construction Group Inc. - Pacific Beach Hornblend Office Space Ground up Construction
K.D.Stahl Construction Group Inc. - Pacific Beach Hornblend Office Space Ground up Construction

K.D. Stahl Construction Progress Update - Bunker Hill Offices Tenant Improvement by Sean Stahl

The Bunker Hill Renovation is moving along at a timely speed. We currently have, All Inclusive Drywall, completing drywall finishes, with tile in all bathrooms being completed by Global Tile and Marble. Lighting and Electrical finishes are being installed by Morrow Meadows Electric and the acoustic ceilings are being completed right behind them by Daryl Griffis AcousticsSee the photos showing the current status of the project. 

Located at:
3033 Bunker Hill St.
San Diego, Ca 92109

K.D. Stahl Construction - Bunker Hill Renovation Project Update

ARCHITECTURAL DESIGN
Prismática Design

ELECTRICAL
Randall Lamb

PLUMBING & MECHANICAL
Randall Lamb

SCOPE OF WORK:
Tenant improvement of existing 3 story, 26,000 sf. office building with basement in Pacific Beach, San Diego CA. The location is destined to be the headquarters of Fortune Builders, a premier real state investing education company. The project includes the build out of office spaces, conference rooms, class rooms, a film studio and a cafeteria.


blog update: 03/15/17

The project is moving along as we are currently framing and drywalling. We will keep you updated as the construction continues to come together. 


Blog update 01/10/17

 
 

K.D. Stahl Construction Awarded Renovation of Scripps Summit Pointe by Sean Stahl

 
 

We have just started the Interior and Exterior Renovations of the Scripps Summit Pointe Project.

 


 

Located at:
10641 Scripps Summit Court
San Diego, California
 

 

Architect
MAA Architects, Inc.

Interior Design
DesignCorp

Structural
Miyamoto International, Inc.

Mechanical & Plumbing
Harinton Mechanical Design

Electrical
Nutter Electrical

 

Scope of Work: 

The building's exteriors will be built out with new finishes and features as well as various amount of hardscape improvements totaling 4,764 sqft. Addition of a BBQ Bar and Trellis to the exterior. Modifications to existing exterior canopy & exterior stairwell facades. Modifications to existing exterior storefront door openings. The interior renovations include a built to suite renovation. 


 
Scripps Summit Point Renovations by K.D. Stahl Construction
Scripps Summit Point Renovations by K.D. Stahl Construction

K.D. Stahl Construction Project update: Bedrosian Tile and Stone by Sean Stahl

 

We have finally had a gap in the weather to get the site graded and the storm drain system holes dug and the pipes laid. 


K.D. Stahl Construction Completed Demo Of Project Site For The New Home Of Bedrosians Tile & Stone San Diego Showroom

Update 01.30.17

The Demo is completed at the project site of the future home of Bedrosian Tile & Stone Showroom. This demolished concrete will be crushed and used as backfill.  

Bedrosian Tile & Stone old site demo

K.D. Stahl Construction was awarded as commercial general contractor for the new Bedrosians Tile & Stone Showroom of San Diego

Scope of Work

The new construction project will entail a 30,000 Sq.Ft. tilt-up building, with 6,500 Sq. Ft. of showroom, offices, and site work. The project is currently in the permitting process and is scheduled to start July 2016.

Team

Bedrosian Tile & Stone
Tenant

Gensler
Architect

Dan Dickey
Project Manager

Chris Cherry
Superintendent